We've launched our app for Cademys. Download now for a smoother and faster experience on the go!
Download our app
Follow the stories of academics and their research expeditions
Answer: Supervising site activities, ensuring quality control, managing manpower, checking drawings, monitoring progress, and coordinating with contractors and consultants.
Answer: Working drawings are issued before construction begins, while as-built drawings show the actual dimensions and details after completion.
Answer: M20 = 20 N/mm², M25 = 25 N/mm² compressive strength. The higher the grade, the stronger and more durable the concrete.
Answer: For M20 mix (1:1.5:3): Cement = ~8 bags, Sand = 0.44 m³, Aggregate = 0.88 m³.
Answer: Curing maintains moisture in concrete to ensure proper hydration, strength gain, and durability.
Answer: AutoCAD, Revit, Primavera P6, Excel for Estimation, and QA/QC tools.
Learn these at Cademys:
Answer: QA = Process-oriented (preventing mistakes), QC = Product-oriented (finding mistakes).
Learn QA/QC with Cademys: QA/QC for Civil Engineers
Answer: 7850 kg/m³.
Answer: ~500 standard bricks (with mortar).
Answer: 7 days for normal cement, 14 days for large structures.
Review basic formulas for concrete, steel, and soil mechanics.
Revise estimation and BOQ preparation.
Get familiar with site management responsibilities.
Be confident in answering “Which software do you know?”—this can be a deciding factor.
Civil engineering interviews in 2025 test not just theory, but practical site knowledge and software skills. Prepare these top 20 interview questions and boost your chances of landing your first job.
Start your preparation with expert-led courses at Cademys.com and make yourself job-ready today.
Mon, 11 Aug 2025
Leave a comment